Pillars that are not measured yet
What each message on a pillar means, and the one step that measures it.
Some pillars cannot be measured from your public pages alone. Until they can, the pillar says why, and nothing is guessed in the meantime. The message is also a link to the step that fixes it.
| The pillar says | What it needs |
|---|---|
| Connect Stripe | A read-only key on Stripe |
| Connect Google | Search Console and Analytics on Google |
| Install the pixel | The pixel on your Website |
| Connect analytics | Your tool on Analytics |
| Add evidence | A saved record, from an action on Roadmap |
| Collecting data | Nothing: the first numbers are arriving |
| Opens at a stage | Nothing: it starts when you reach that stage |
| Not measured yet | A first read, or a source your site cannot offer |
A pillar with a number says how much of what counts there was read. A low share means more sources would sharpen it, not that the number is wrong.
After you connect something
Connect the source
Follow the step on the pillar. Each source has its own article under Connect.
Wait for the next read
Your site is read every day. Numbers from a new source arrive within a day.
Or ask for it now
Press Refresh now on Score. Without a plan that includes it, you can ask once a week.
Why is my score missing while some pillars are measured?
The total needs enough of the pillars read. Until then Score says Measuring and how many pillars are measured, with the step that opens the most.
Who can connect sources?
Owners and editors connect sources. Collaborators view the workspace.
Did not find your answer? A person reads every request.
Ask support